ProjectName | Client | Address | StartDate | EndDate |
---|---|---|---|---|
Supply of Labor, Supervision, Tools and Equipment for Erecting and Dismantling Scaffolding of Unit 2 | FDC Misamis Power Corporation | Villanueva Misamis Oriental | 2022-11-14 | 2022-12-08 |
Unit 1 Short Term Outage | GNPower Mariveles Energy Ltd Co | Alas-asin Mariveles, Bataan | 2022-11-08 | 2022-11-19 |
Overhauling of Circulating Water Pump | Therma South Inc | Toril Davao City | 2022-10-17 | 2022-11-04 |
Unit 2 Bearing Inspection and Replacement | Therma South Inc | Toril Davao City | 2022-10-09 | 2022-11-04 |
CWP & CEP Observer | Therma Visayas Inc | Toledo City Cebu | 2022-10-09 | 2022-10-28 |
Replacement of Boiler Feed Pump Unit 2A and Drive Shaft Alignment Correction Unit 2B | Therma South Inc | Toril Davao City | 2022-10-09 | 2022-10-23 |
Supply of Labor, Supervision, Tools and Equipment for Erecting and Dismantling Scaffolding of Unit 1 | FDC Misamis Power Corporation | Villanueva Misamis Oriental | 2022-09-21 | 2022-10-22 |
Supply of Rigging and Millwright Services for Unit 1 Turbine Major Overhaul | Minergy Power Corporation | Mandangoa Balingasag Misamis Oriental | 2022-10-03 | 2022-10-22 |
Replacement of Shredder Blades | San Carlos Biopower Inc | San Carlos Ecozone San Carlos City Negros Occidental | 2022-09-14 | 2022-10-13 |
Unit 1 Turbine Major Overhauling/Rotor Replacement | Therma South Inc | Toril Davao City | 2022-08-20 | 2022-10-05 |
Reorientation of the Loose Crane Trash Shredder Wheels and Replacement of the Bale Crane Trash Shred | South Negros Biopower | Brgy Cubay La Carlota City Negros Occidental | 2022-08-03 | 2022-09-29 |
Unit 2 Main Control Valve | Therma South Inc | Toril Davao City | 2022-08-31 | 2022-09-20 |
BOP Manpower for Major Pump Works | Therma South Inc | Toril Davao City | 2022-08-22 | 2022-09-19 |
Unit 1 Outage Mechanical Works | GNPower Dinginin Ltd Co | Alas-asin Mariveles, Bataan | 2022-08-29 | 2022-09-12 |
Alignment of Existing Boiler Feed Pump Unit 1A and 1B, and Drive Shaft Alignment Correction | Therma South Inc | Toril Davao City | 2022-08-22 | 2022-09-12 |
Extension of Supplementary Support for Unit 1, 2 and BOP | GNPower Dinginin Ltd Co | Alas-asin Mariveles, Bataan | 2022-03-08 | 2022-08-27 |
Pump and Motor Laser Alignment Check-Texas Instrument | Eastman Industrial Supply Inc | Clark Freeport Mabalacat Pampanga | 2022-08-16 | 2022-08-16 |
Manpower Supply for Unit 1 Turbine Overhauling | Minergy Power Corporation | Mandangoa Balingasag Misamis Oriental | 2022-07-13 | 2022-08-03 |
Manpower Supply for Stacker & Reclaimer | GNPower Dinginin Ltd Co | Alas-asin Mariveles, Bataan | 2022-03-08 | 2022-05-08 |
Support Services for Coal Handling System C4, C6 Plough Unit 2 | GNPower Dinginin Ltd Co | Alas-asin Mariveles, Bataan | 2022-03-08 | 2022-04-24 |
Supply of Manpower for Ship Unloader 3 & 4 | GNPower Dinginin Ltd Co | Alas-asin Mariveles, Bataan | 2022-03-08 | 2022-04-24 |
Supply of Manpower for the Application for Defects Team | GNPower Dinginin Ltd Co | Alas-asin Mariveles, Bataan | 2022-03-08 | 2022-04-24 |
Unit 3 A Internal Inspection due to Abnormal Sound | GNPower Kauswagan Ltd. Co. | Lanao del Norte | 2020-08-02 | 2021-08-05 |
Unit 2 B Disassembly of Mill Tyre | GNPower Kauswagan Ltd. Co. | Lanao del Norte | 2021-04-17 | 2021-07-27 |
Unit 2 Inspection of Pedestal 1 and 3 | Therma South Inc. | Barangay Binugao, Toril, Davao City | 2021-06-11 | 2021-06-15 |
Supply of Manpower Tools and Equipment for Bearing Inspection of Unit 1 Steam Turbine and Generator | Therma South Inc. | Barangay Binugao, Toril, Davao City | 2021-05-11 | 2021-06-14 |
Mill 1C Inspection & Mill 1A Minor Inspection and PF Line Inspection and Gasket | GNPower Kauswagan Ltd. Co. | Lanao del Norte | 2020-06-01 | 2021-06-08 |
Supply of Manpower Tools and Equipment for Bearing Inspection of Unit 2 Steam Turbine and Generator | Therma South Inc. | Barangay Binugao, Toril, Davao City | 2021-04-11 | 2021-04-26 |
Alignment and Vibration Reading Monitoring of Ball Mill 1 | Big Boss Cement Inc. | Angeles, Floridablanca, Dinalupihan Rd, Porac, Pampanga | 2021-04-14 | 2021-04-16 |
Alignment Checking, Correction and Balancing of Rotating Equipment | Big Boss Cement Inc. | Angeles, Floridablanca, Dinalupihan Rd, Porac, Pampanga | 2021-04-10 | 2021-04-13 |
Ball Mill Laser Alignment | Big Boss Cement Inc. | Angeles, Floridablanca, Dinalupihan Rd, Porac, Pampanga | 2021-03-22 | 2021-03-25 |
Unit 1 B Screw Cooler De-clogging | Therma South Inc. | Barangay Binugao, Toril, Davao City | 2020-12-24 | 2020-12-29 |
Replacement and Installation of Screw Cooler Conveyor Unit 1 D | Therma South Inc. | Barangay Binugao, Toril, Davao City | 2020-12-22 | 2020-12-24 |
Supply of Manpower, Tools and Equipment for Unit 1 Bearing Inspection | Therma South Inc. | Barangay Binugao, Toril, Davao City | 2020-12-12 | 2020-12-16 |
Unit 3 A Internal Inspection due to Abnormal Sound | GNPower Kauswagan Ltd. Co. | Lanao del Norte | 2020-08-06 | 2020-08-09 |
Unit 1E Pull out of roller and Grinding table to install at Unit 1B | GNPower Kauswagan Ltd. Co. | Lanao del Norte | 2020-07-04 | 2020-08-06 |
Unit 1A & 1B APH Internal radial seal plate adjustment & Repair | GNPower Kauswagan Ltd. Co. | Lanao del Norte | 2020-07-20 | 2020-07-31 |
Unit 1 Steam Turbine Minor Overhaul | Therma South Inc. | Toril, Davao City | 2020-05-27 | 2020-06-26 |
Preventive Maintenance of Boiler Pressure Parts Repair Unit 1 | Therma South Inc. | Toril, Davao City | 2020-05-29 | 2020-06-17 |
Unit 2C Inspection and Correction due to Abnormal Sound (Vibration) | GN Power Kauswagan Ltd. Co. | Lanao del Norte | 2020-06-01 | 2020-06-08 |
Unit 2C Inspection and Correction due to Abnormal Sound (Vibration) | GNPower Kauswagan Ltd. Co. | Lanao del Norte | 2020-06-01 | 2020-06-08 |
Supply of Manpower, Tools & Equipment for the Re-assembly of Unit 2 Steam Turbine | Therma South Inc. | Toril, Davao City | 2020-04-17 | 2020-05-15 |
Pull-out and Insertion of Generator Rotor | Quartzelec Ltd. | SLPGC, Calaca, Batangas | 2020-03-26 | 2020-05-05 |
Unit 1 Mill A PF Lines Victaulic Gasket Replacement | GN Power Kauswagan Ltd. Co. | Lanao del Norte | 2020-04-28 | 2020-04-29 |
Unit 1 Mill A PF Lines Victaulic Gasket Replacement | GNPower Kauswagan Ltd. Co. | Lanao del Norte | 2020-04-28 | 2020-04-29 |
Unit 1 Boiler Maintenance (Welding Works) Emergency Repair | Therma South Inc | Toril, Davao City | 2020-04-21 | 2020-04-26 |
Unit 1 Boiler Maintenance (Welding Works) Emergency Repair | Therma South Inc. | Toril, Davao City | 2020-04-21 | 2020-04-26 |
Unit 1 Boiler Maintenance (Welding Works) Emergency Repair | Therma South Inc | Toril, Davao City | 2020-04-02 | 2020-04-14 |
Unit 1 Boiler Maintenance (Welding Works) Emergency Repair | Therma South Inc. | Toril, Davao City | 2020-04-02 | 2020-04-14 |
Unit 1 Mill A Inspection and Replacement of Victaulic Gasket | GN Power Kauswagan Ltd. Co. | Lanao del Norte | 2020-04-10 | 2020-04-11 |
Unit 1 Mill A PF Lines Victaulic Gasket Replacement | GN Power Kauswagan Ltd. Co | Lanao del Norte | 2020-03-23 | 2020-03-31 |
Unit 1 Mill A Inspection and Replacement of Victaulic Gasket | GN Power Kauswagan Ltd. Co. | Lanao del Norte | 2020-03-28 | 2020-03-29 |
Mill 3E Minor Inspection | GN Power Kauswagan Ltd. Co | Lanao del Norte | 2020-03-20 | 2020-03-23 |
Mill 1C Inspection | GN Power Kauswagan Ltd. Co | Lanao del Norte | 2020-03-18 | 2020-03-20 |
Mill 1A Minor Inspection and PF Line Inspection and Gasket | GN Power Kauswagan Ltd. Co | Lanao del Norte | 2020-03-07 | 2020-03-18 |
Mills and Pulverized Fuel Lines and Air and Flue Gas System Outage Activities | GN Power Mariveles Coal Plant Ltd. Co | Mariveles, Bataan | 2020-01-06 | 2020-03-13 |
Coal Milling Services (Minor) for Unit 2 | GN Power Kauswagan Ltd. Co | Lanao del Norte | 2020-03-03 | 2020-03-07 |
Scaffolding Installation and Removal for Annual PMs of Unit 2 | FDC Misamis Power Corporation | PHIVIDEC Industrial | 2020-01-27 | 2020-02-17 |
Replacement of Capacity Damper of Pulverizer B & D Capacity Damper and Alignment of Capacity Damper | Pearl Energy Philippines Operating, Inc. | Quezon | 2020-01-20 | 2020-02-14 |
Repair of Sea Water Intake Gate and Supply of Tools and Materials for Cleaning and Painting of Sea W | Pearl Energy Philippines Operating, Inc. | Quezon | 2020-01-20 | 2020-02-14 |
Fans Works (Primary Air Fan A&B, Forced Draft Fan A&B, Induced Draft Fan A&B) | Pearl Energy Philippines Operating, Inc. | Quezon Power | 2020-01-20 | 2020-02-14 |
Support Complete Reassembly of the Turbine and Valves | Therma South Inc | Toril, Davao City | 2019-12-14 | 2020-02-09 |
Coal Milling Services (Minor) for Unit 1 | GN Power Kauswagan Ltd. Co. | Lanao del Norte | 2020-01-27 | 2020-02-06 |
Manual Cleaning of Gas Air Preheater Basket Elements (Unit 2) | San Miguel Consolidated Power Corporation | Brgy. Culaman, Malita Davao Occidental | 2020-01-08 | 2020-01-24 |
Extention of Manpower supply for reassembly of Unit 1 hip turbine and Extended service of EDL for Un | GN Power Mariveles Coal Plant Ltd. Co. | Mariveles, Bataan | 2019-12-01 | 2019-12-14 |
Manual Cleaning of Gas Air Preheater Basket Elements (Unit 1) | San Miguel Consolidated Power Corporation | Brgy. Culaman, Malita Davao Occidental | 2019-11-30 | 2019-12-13 |
Extension of Manpower Supply for Unit 1 HP/IP Turbine Stripping and Reassembly | GN Power Mariveles Coal Plant Ltd. Co. | Mariveles, Bataan | 2019-11-10 | 2019-11-30 |
Supply of Labor and Laser Alignment Equipment for San Carlos BioPower | GreenPower Technology Services Inc. | San Carlos BioPower, Negros Occidental | 2019-11-16 | 2019-11-26 |
HP and IP Turbine Stripping and Reassembly | GN Power Mariveles Coal Plant Ltd. Co. | Mariveles, Bataan | 2019-10-08 | 2019-11-23 |
Supply of Manpower for Cleaning of Accumulations inside the Boiler | Team Energy Sual Power Station | Sual, Pangasinan | 2019-10-23 | 2019-11-02 |
Steam Turbine, Gear Box, Generator Laser Alignment & Laser Alignment of Feedwater and Draft System | Jettech Engineering | Nueva Ecija | 2019-09-21 | 2019-10-13 |
Erection and Dismantling of Scaffolding Boiler Unit 1 | FDC Misamis Power Corporation | PHIVIDEC Industrial Estate, Brgy. Tambobong-Balacanas, Villanueva, Misamis Oriental | 2019-09-14 | 2019-10-02 |
Urgent Repair Tube Leak for Unit 2 Boiler | FDC Misamis Power Corporation | PHIVIDEC Industrial Estate, Brgy. Tambobong-Balacanas, Villanueva, Misamis Oriental | 2019-09-04 | 2019-09-08 |
Turbine Disassembly and Inspection | Therma South Inc. | Barangay Binugao , Toril, Davao City | 2019-07-18 | 2019-09-06 |
Steam Turbine, Gear Box, Generator Laser Alignment | Green Innovations for Tomorrow Corporation | Nueva Ecija | 2019-08-21 | 2019-08-26 |
Manpower Supply for PMS of Pasar at Isabel Leyte | PASAR | Isabel, Leyte | 2019-07-19 | 2019-08-11 |
Retubing of 12 Joints | SMC Consolidated Power Corporation | Limay, Bataan | 2019-08-07 | 2019-08-11 |
PSV (Repair and Calibration) | Green Innovations for Tomorrow Corporation | Nueva Ecija | 2019-07-18 | 2019-07-23 |
Unit 2 STG Major Inspection | Therma South Inc, Barangay Binugao | Toril, Davao City | 2019-05-22 | 2019-07-19 |
PA Fan Installation | SEM Calaca Power Corporation | Brgy. San Rafael, Calaca, Batangas | 2019-04-03 | 2019-07-09 |
Urgent Repair Tube Leak for Unit 3 Boiler | FDC Misamis Power Corporation | PHIVIDEC Industrial Estate, Brgy. Tambobong-Balacanas, Villanueva, Misamis Oriental | 2019-06-30 | 2019-07-09 |
Installation of CMC Controller at SLPGC 2x150MW | Southwest Luzon Power Generation Corporation | Calaca, Batangas | 2019-06-06 | 2019-06-28 |
Urgent Repair for Unit 2 Back-Pass Front Wall Tube Leak (LEFT AND RIGHT CORNER) | FDC Misamis Power Corporation | PHIVIDEC Industrial Estate, Brgy. Tambobong-Balacanas, Villanueva, Misamis Oriental | 2019-06-15 | 2019-06-20 |
Replacement of Turbine Runner and Wicket Gate Repair | Peoples Energy Services Inc. | Lake Buhi-Barit River Hydroelectric Power Plant, Buhi, Camarines Sur | 2019-04-13 | 2019-05-30 |
Unit 1 Turbine Control Valve PMS | Therma South Inc, Barangay Binugao | Toril, Davao City | 2019-03-22 | 2019-03-24 |
Boiler Tube Repair | GNPower Mariveles Coal Plant Ltd. | Mariveles, Bataan | 2019-03-07 | 2019-03-24 |
Inspection and Cleaning of Generator Air Cooler | Therma South Inc, Barangay Binugao | Toril, Davao City | 2019-03-07 | 2019-03-18 |
Turbine and Generator Minor Inspection | SMC Consolidated Power Corporation | Brgy. Lamao, Limay, Bataan | 2019-02-12 | 2019-03-16 |
Installation of 2 Sets PA Shut Off Dampers Unit 1 A/B | GNPower Mariveles Coal Plant Ltd. | Mariveles, Bataan | 2019-01-06 | 2019-02-06 |
Replacement of Mill Pressure Frame for 1 F | GNPower Mariveles Coal Plant Ltd. | Mariveles, Bataan | 2019-01-06 | 2019-02-06 |
Installation of Manual Isolation Valves for Boiler Unit 1 | GNPower Mariveles Coal Plant Ltd. | Mariveles, Bataan | 2019-01-11 | 2019-02-06 |
Installation of Pipe Hanger and Snubber for Main Steam Line | GNPower Mariveles Coal Plant Ltd. | Mariveles, Bataan | 2019-01-11 | 2019-02-06 |
Internal Repair of Boiler System Drum for Unit 1 | GNPower Mariveles Coal Plant Ltd. | Mariveles, Bataan | 2019-01-11 | 2019-02-06 |
Internal Repair of Deaerator, Restoration of Tray and Weld Repair of DN 350 Valve (Flanges) | GNPower Mariveles Coal Plant Ltd. | Mariveles, Bataan | 2019-01-11 | 2019-02-06 |
Replacement / Repair of Erosion Shield for Unit 1 Boiler | GNPower Mariveles Coal Plant Ltd. | Mariveles, Bataan | 2019-01-11 | 2019-02-06 |
Replacement/Repair of 9 Tubes for LTSH and 4-6 Tubes for Dead Space of the Boiler Unit 1 | GNPower Mariveles Coal Plant Ltd. | Mariveles, Bataan | 2019-01-11 | 2019-02-06 |
Repair of Hanger and Snubber at Cold Re-Heat Line (Main Steam) | GNPower Mariveles Coal Plant Ltd. | Mariveles, Bataan | 2019-01-11 | 2019-02-06 |
Repair of Hanger at Boiler Dead Space (North Side) and Boiler Hopper Bottom | GNPower Mariveles Coal Plant Ltd. | Mariveles, Bataan | 2019-01-11 | 2019-02-06 |
Replacement of 900 Pieces Air Preheater Tubes | Green Innovations for Tomorrow Corporation | Nueva Ecija | 2019-01-02 | 2019-01-19 |
Replacement of Primary and Secondary Super Heater Tubes | Green Innovations for Tomorrow Corporation | Nueva Ecija | 2018-12-02 | 2019-01-18 |
Replacement of 900 Pieces Air Preheater Tubes | Green Innovations for Tomorrow Corporation | Nueva Ecija | 2018-12-02 | 2018-12-24 |
Coal Feeder (B) Belt Replacement for Unit 1 | SMC Consolidated Power Corporation | Brgy. Lamao, Limay, Bataan | 2018-11-20 | 2018-11-21 |
Manual Cleaning of Gas Air Preheater Basket Elements ? Unit 1 | San Miguel Consolidated Power Corporation (SMCPC) | Brgy. Culaman, Malita, Davao Occidental | 2018-07-03 | 2018-07-20 |
Bearing Inspection of Steam Turbine and Generator | San Miguel Consolidated Power Corporation (SMCPC) | Brgy. Culaman, Malita, Davao Occidental | 2018-07-08 | 2018-07-20 |
Overlay/Build-up of Worn-out Tubes | United Pulp and Paper Company Incorporated | Km. 48 MacArthur Highway, Calumpit Bulacan | 2018-06-25 | 2018-06-26 |
Replacement of Damaged Grid Nozzles | United Pulp and Paper Company Incorporated | Km. 48 MacArthur Highway, Calumpit Bulacan | 2018-06-18 | 2018-06-25 |
GMCP UNIT 2 MAJOR OUTAGE | GN Power Mariveles Coal Plant Ltd | Mariveles, Bataan | 2018-02-19 | 2018-03-24 |
Manual Cleaning of Super Heater Tubes and Thickness Gauging | Green Innovation for Tomorrow Corporation (GIFT Corp.) | Bacal II, Talavera, Nueva Ecija | 2018-03-05 | 2018-03-16 |
Unit 1 Turbine Generator Minor Overhauling for Bearing Inspection | Therma South Inc | Barangay Binugao , Toril , Davao City | 2018-02-18 | 2018-03-16 |
Unit 2 Turbine Generator Minor Overhauling for Bearing Inspection | Therma South Inc | Barangay Binugao , Toril , Davao City | 2018-01-10 | 2018-02-03 |
Replacement of LP Casing and Inspection of Turbine | Green Innovation for Tomorrow Corporation (GIFT Corp.) | Bacal II, Talavera, Nueva Ecija | 2017-09-18 | 2017-09-29 |
High Pressure Washing/Cleaning of Steam Turbine Condenser and Generator Air Cooler | Green Innovation for Tomorrow Corporation (GIFT Corp.) | Bacal II, Talavera, Nueva Ecija | 2017-09-18 | 2017-09-29 |
Renovation of Ash Screw Conveyor and Pneumatic Fuel Spreader | Green Innovation for Tomorrow Corporation (GIFT Corp.) | Bacal II, Talavera, Nueva Ecija | 2017-09-18 | 2017-09-29 |
Air Pre Heater Tube Replacement | Green Innovation for Tomorrow Corporation (GIFT Corp.) | Bacal II, Talavera, Nueva Ecija | 2017-09-18 | 2017-09-29 |
Unit #2 GAH manual Cleaning of Basket Elements 600 MW CFB Power Plant | San Miguel Consolidated Power Corporation (SMCPC) | Brgy. Culaman, Malita, Davao Occidental | 2017-08-03 | 2017-08-26 |
Mid outage activities in Unit 2 Steam Turbine | South Luzon Thermal Energy Corporation | Puting Bato West, Calaca, Batangas | 2017-08-04 | 2017-08-15 |
Unit #1 GAH manual Cleaning of Basket Elements 600 MW CFB Power Plant | San Miguel Consolidated Power Corporation (SMCPC) | Brgy. Culaman, Malita, Davao Occidental | 2017-06-26 | 2017-07-23 |
Dismantling and Replacement of Four(4) units Water Pump Assembly | GN Power Mariveles Coal Plant Ltd | Mariveles, Bataan | 2017-06-29 | 2017-07-10 |
Onsite Dynamic balancing if IDF and FDF | South Luzon Thermal Energy Corporation | Puting Bato West, Calaca, Batangas | 2017-06-22 | 2017-06-24 |
Replacement of Pre-Heater Cold End Basket of GMCP Unit 1 & 2 | GN Power Mariveles Coal Plant Ltd | Mariveles, Bataan | 2017-02-08 | 2017-03-22 |
Replacement of High-Pressure Heater #1, #2, & #3 at GMCP Unit 1 & 2 | GN Power Mariveles Coal Plant Ltd | Mariveles, Bataan | 2017-02-08 | 2017-03-22 |
Inspection of LP Blades and Revision of Crossover Gasket | South Luzon Thermal Energy Corporation | Puting Bato West, Calaca, Batangas | 0000-00-00 | 2017-03-16 |
Inspection of HIP Blades & Suspended Leak at HIP casing at Unit 1 | South Luzon Thermal Energy Corporation | Puting Bato West, Calaca, Batangas | 0000-00-00 | 2017-03-16 |
Replacement of Valves and Elbows for Fly Ash Conveying line | Quezon Power Plant | Mauban Quezon | 2017-01-22 | 2017-01-24 |
Repair of Pre Dust Collector for Air Pre heater | Green Innovation for Tomorrow Corporation (GIFT Corp.) | Bacal II, Talavera, Nueva Ecija | 2016-12-28 | 2017-01-06 |
Installation of Ash Breaker Plate for Air Pre Heater Hot Inside | Green Innovation for Tomorrow Corporation (GIFT Corp.) | Bacal II, Talavera, Nueva Ecija | 2016-12-28 | 2017-01-04 |
High Pressure Washing/Cleaning of Steam Turbine Condenser | Green Innovation for Tomorrow Corporation (GIFT Corp.) | Bacal II, Talavera, Nueva Ecija | 2016-12-05 | 2016-12-20 |
High Pressure Washing/Cleaning of Generator Air Cooler | Green Innovation for Tomorrow Corporation (GIFT Corp.) | Bacal II, Talavera, Nueva Ecija | 2016-12-05 | 2016-12-20 |
Installation of Expansion Bellows of Petron's FCC2 | Petron Bataan Refinery | Limay, Bataan | 2016-11-16 | 2016-11-29 |
Governor Valve Packing Replacement and Installation of Baffle Plate | United Pulp and Paper Company Incorporated | Km. 48 MacArthur Highway, Calumpit Bulacan | 0000-00-00 | 0000-00-00 |
Unit #2 GAH Manual Cleaning of Basket Elements 600 MW CFB Clean Coal Power Plant | San Miguel Consolidated Power Corporation (SMCPC) | Brgy. Culaman, Malita, Davao Occidental | 0000-00-00 | 0000-00-00 |
Hydro Jet Cleaning | Shell Refinery | Tabangao, Batangas | 0000-00-00 | 0000-00-00 |